Assessment Year | 2008 |
---|---|
Principal Product | Solder Paste |
NAICS | 331491: Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 149 |
Plant Area |
43,683
ft2
|
Annual Production | 663,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $205,554 | 2,363,653 |
kWh
|
$0.087 |
Electricity Demand | $64,603 | 6,353 |
kW-mo/yr
|
$10.17 |
Electricity Fees | $51,329 | - |
|
- |
Natural Gas | $121,539 | 12,024 |
MMBtu
|
$10.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $222,037 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,401 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $468 | - | - |
$468
-
kW-mo/yr
|
- | - | |
02 | 2.4314: Use synthetic lubricant | $191 | - |
$141
1,622
kWh
|
$50
-
kW-mo/yr
|
- | - | |
03 | 3.1191: Change procedures / equipment / operating conditions | $214,622 | $23,800 |
$(-1,357.0)
(-15,600)
kWh
|
$(-498.0)
-
kW-mo/yr
|
- | $216,477 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,615 | $252 |
$1,183
13,603
kWh
|
$432
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $786 | $223 |
$537
6,178
kWh
|
$249
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,263 | $3,368 |
$2,366
27,198
kWh
|
$897
-
kW-mo/yr
|
- | - | |
07 | 2.6211: Conserve energy by efficient use of vending machines | $171 | $310 |
$171
1,971
kWh
|
- | - | - | |
08 | 2.3212: Optimize plant power factor | $921 | $4,079 | - | - | $921 | - | |
TOTAL RECOMMENDED | $222,037 | $32,032 |
$3,041
34,972
kWh
|
$1,598
-
kW-mo/yr
|
$921 | $216,477 | ||
TOTAL IMPLEMENTED | $2,401 | $475 |
$1,720
19,781
kWh
|
$681
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs