| Assessment Year | 2008 |
|---|---|
| Principal Product | Digital Cameras |
| NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
| SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 27 |
| Plant Area |
14,700
ft2
|
| Annual Production | 2,500
pieces
|
| Production Hrs. Annual | 3,080
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $41,635 | 358,059 |
kWh
|
$0.12 |
| Electricity Demand | $8,154 | 825 |
kW-mo/yr
|
$9.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,596 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,870 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6231: Utilize controls to operate equipment only when needed | $4,456 | - |
$4,456
38,416
kWh
|
- | - | |
| 02 | 2.8121: Apply for tax-free status for energy purchases | $3,305 | - | - | - | $3,305 | |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $335 | - |
$295
2,543
kWh
|
$40
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,384 | $100 |
$3,028
26,105
kWh
|
$356
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,354 | $121 |
$1,008
8,686
kWh
|
$346
-
kW-mo/yr
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,614 | $408 |
$2,337
20,148
kWh
|
$277
-
kW-mo/yr
|
- | |
| 07 | 2.6211: Conserve energy by efficient use of vending machines | $230 | $258 |
$230
1,980
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $307 | $474 |
$307
2,649
kWh
|
- | - | |
| 09 | 2.7314: Reduce ventilation air | $1,611 | $13,919 |
$1,581
13,631
kWh
|
$30
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $17,596 | $15,280 |
$13,242
114,158
kWh
|
$1,049
-
kW-mo/yr
|
$3,305 | ||
| TOTAL IMPLEMENTED | $6,870 | $1,240 |
$6,197
53,425
kWh
|
$673
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs