Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product O-rings, Seals, Gaskets
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 111
Plant Area 60,000
ft2
Annual Production 360,000,000
pieces
Production Hrs. Annual 4,264
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,218 3,294,550
kWh
Electricity Demand $33,195 9,026
kW-mo/yr
Electricity Fees $1,381 -
Natural Gas $44,702 3,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $244,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $16,481 - - - - $16,481
02 2.8114: Change rate schedules or other changes in utility service $3,129 - - - - $3,129
03 2.6218: Turn off equipment when not in use $1,056 - $946
10,400
kWh
$110
-
kW-mo/yr
- -
04 2.4314: Use synthetic lubricant $659 - $567
6,230
kWh
$92
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $111 - $96
1,055
kWh
$15
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,250 $149 $1,114
12,240
kWh
$136
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $914 $160 $815
8,960
kWh
$99
-
kW-mo/yr
- -
08 3.1191: Change procedures / equipment / operating conditions $213,621 $114,259 - - - $213,621
09 2.7142: Utilize higher efficiency lamps and/or ballasts $491 $469 $231
2,540
kWh
$11
-
kW-mo/yr
- $249
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,446 $4,400 $3,097
34,031
kWh
$349
-
kW-mo/yr
- -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,915 $2,847 $1,897
20,850
kWh
$18
-
kW-mo/yr
- -
12 2.6211: Conserve energy by efficient use of vending machines $197 $344 $197
2,165
kWh
- - -
13 2.7135: Install occupancy sensors $112 $357 $112
1,227
kWh
- - -
14 2.3212: Optimize plant power factor $1,080 $9,965 - - $1,080 -
TOTAL RECOMMENDED $244,462 $132,950 $9,072
99,698
kWh
$830
-
kW-mo/yr
$1,080 $233,480
TOTAL IMPLEMENTED $8,039 $5,535 $6,978
76,683
kWh
$812
-
kW-mo/yr
- $249
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs