ITAC Assessment: SU0257
ITAC logo
ITAC Assessment: SU0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Lightweight Specialty Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 135,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 8,769
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,268,484 34,258,817
kWh
Electricity Demand $421,545 61,924
kW-mo/yr
Electricity Fees $34,685 -
Natural Gas $3,011,852 24,706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $517,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $502,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $17,366 - $15,753
165,816
kWh
$1,613
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $9,043 - $7,505
79,002
kWh
$1,538
-
kW-mo/yr
- - -
03 2.4314: Use synthetic lubricant $4,349 - $3,893
40,984
kWh
$456
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,124 $1,000 $11,906
125,328
kWh
$1,218
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $5,261 $712 $4,369
45,990
kWh
$892
-
kW-mo/yr
- - -
06 2.2442: Preheat combustion air with waste heat $323,145 $79,171 - - - $323,145
-
MMBtu
-
07 2.7135: Install occupancy sensors $6,815 $1,735 $6,815
71,736
kWh
- - - -
08 2.2136: Install / repair insulation on steam lines $561 $250 - - - $561
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $901 $632 $383
4,030
kWh
$41
-
kW-mo/yr
- - $477
10 2.7142: Utilize higher efficiency lamps and/or ballasts $9,859 $12,203 $8,933
93,996
kWh
$926
-
kW-mo/yr
- - -
11 2.4321: Upgrade obsolete equipment $112,898 $150,000 $102,415
1,078,056
kWh
$10,483
-
kW-mo/yr
- - -
12 2.6211: Conserve energy by efficient use of vending machines $144 $272 $144
1,516
kWh
- - - -
13 2.3212: Optimize plant power factor $14,173 $42,224 - - $14,173 - -
TOTAL RECOMMENDED $517,639 $288,199 $162,116
1,706,454
kWh
$17,167
-
kW-mo/yr
$14,173 $323,706
-
MMBtu
$477
TOTAL IMPLEMENTED $502,565 $245,343 $161,733
1,702,424
kWh
$17,126
-
kW-mo/yr
- $323,706
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs