ITAC Assessment: SU0256
ITAC logo
ITAC Assessment: SU0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Container Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 138
Plant Area 500,000
ft2
Annual Production 220,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,413,867 102,159,935
kWh
Electricity Demand $1,335,058 156,918
kW-mo/yr
Electricity Fees $834,972 -
Natural Gas $171,020 16,395
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $322,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,194 - $2,633
12,965
kWh
$2,561
-
kW-mo/yr
- -
02 2.4314: Use synthetic lubricant $1,158 - $631
26,279
kWh
$527
-
kW-mo/yr
- -
03 2.2113: Repair or replace steam traps $16,749 $875 - - - $16,749
04 2.2135: Repair and eliminate steam leaks $11,056 $11,106 - - - $11,056
05 2.4221: Install compressor air intakes in coolest locations $3,492 $335 $2,352
98,012
kWh
$1,140
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,792 $1,750 $1,882
78,402
kWh
$910
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,382 $13,420 $11,872
494,662
kWh
$510
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $137 $388 $32
1,314
kWh
$17
-
kW-mo/yr
- $88
09 3.4159: Replace treated water with well / surface water $243,880 $767,215 - - - $243,880
10 2.3212: Optimize plant power factor $25,777 $83,985 - - $25,777 -
TOTAL RECOMMENDED $322,617 $879,074 $19,402
711,634
kWh
$5,665
-
kW-mo/yr
$25,777 $271,773
TOTAL IMPLEMENTED $62,726 $97,716 $5,146
117,646
kWh
$3,998
-
kW-mo/yr
$25,777 $27,805
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs