Assessment Year | 2007 |
---|---|
Principal Product | Container Paper |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 138 |
Plant Area |
500,000
ft2
|
Annual Production | 220,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,413,867 | 102,159,935 |
kWh
|
$0.024 |
Electricity Demand | $1,335,058 | 156,918 |
kW-mo/yr
|
$8.51 |
Electricity Fees | $834,972 | - |
|
- |
Natural Gas | $171,020 | 16,395 |
MMBtu
|
$10.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $322,617 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,726 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,194 | - |
$2,633
12,965
kWh
|
$2,561
-
kW-mo/yr
|
- | - | |
02 | 2.4314: Use synthetic lubricant | $1,158 | - |
$631
26,279
kWh
|
$527
-
kW-mo/yr
|
- | - | |
03 | 2.2113: Repair or replace steam traps | $16,749 | $875 | - | - | - | $16,749 | |
04 | 2.2135: Repair and eliminate steam leaks | $11,056 | $11,106 | - | - | - | $11,056 | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,492 | $335 |
$2,352
98,012
kWh
|
$1,140
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,792 | $1,750 |
$1,882
78,402
kWh
|
$910
-
kW-mo/yr
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,382 | $13,420 |
$11,872
494,662
kWh
|
$510
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $137 | $388 |
$32
1,314
kWh
|
$17
-
kW-mo/yr
|
- | $88 | |
09 | 3.4159: Replace treated water with well / surface water | $243,880 | $767,215 | - | - | - | $243,880 | |
10 | 2.3212: Optimize plant power factor | $25,777 | $83,985 | - | - | $25,777 | - | |
TOTAL RECOMMENDED | $322,617 | $879,074 |
$19,402
711,634
kWh
|
$5,665
-
kW-mo/yr
|
$25,777 | $271,773 | ||
TOTAL IMPLEMENTED | $62,726 | $97,716 |
$5,146
117,646
kWh
|
$3,998
-
kW-mo/yr
|
$25,777 | $27,805 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs