ITAC Assessment: SU0252
ITAC logo
ITAC Assessment: SU0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Lightweight Specialty Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 37
Plant Area 120,000
ft2
Annual Production 33,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,513,757 19,354,027
kWh
Electricity Demand $192,125 65,935
kW-mo/yr
Electricity Fees $59,466 -
Natural Gas $942,182 85,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,998

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,856 - $9,375
120,188
kWh
$481
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $9,114 - $8,671
111,164
kWh
$443
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,725 - $8,101
103,854
kWh
$624
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,543 $901 $6,196
79,440
kWh
$347
-
kW-mo/yr
-
05 2.2135: Repair and eliminate steam leaks $6,404 $134 - - $6,404
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $4,230 $444 $4,006
51,360
kWh
$224
-
kW-mo/yr
-
07 2.2136: Install / repair insulation on steam lines $3,867 $788 - - $3,867
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $11,800 $19,800 $11,226
143,928
kWh
$574
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $184 $426 $184
2,361
kWh
- -
10 2.6211: Conserve energy by efficient use of vending machines $101 $461 $101
1,292
kWh
- -
TOTAL RECOMMENDED $60,824 $22,954 $47,860
613,587
kWh
$2,693
-
kW-mo/yr
$10,271
-
MMBtu
TOTAL IMPLEMENTED $51,998 $22,493 $39,658
508,441
kWh
$2,069
-
kW-mo/yr
$10,271
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs