Assessment Year | 2007 |
---|---|
Principal Product | Converted Paper |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 189 |
Plant Area |
195,448
ft2
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $514,073 | 4,587,977 |
kWh
|
$0.11 |
Electricity Demand | $83,854 | 12,535 |
kW-mo/yr
|
$6.69 |
Electricity Fees | $38,988 | - |
|
- |
Natural Gas | $922,659 | 69,776 |
MMBtu
|
$13.22 |
Fuel Oil #6 | $126,037 | 13,126 |
MMBtu
|
$9.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,248 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,082 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,054 | - |
$4,532
40,465
kWh
|
$522
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,682 | - |
$2,327
20,779
kWh
|
$355
-
kW-mo/yr
|
- | - | |
03 | 2.4314: Use synthetic lubricant | $707 | - |
$613
5,475
kWh
|
$94
-
kW-mo/yr
|
- | - | |
04 | 2.6232: Install set-back timers | $8,210 | $457 | - | - |
$8,210
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,670 | $480 |
$4,188
37,396
kWh
|
$482
-
kW-mo/yr
|
- | - | |
06 | 2.2113: Repair or replace steam traps | $2,314 | $219 | - | - |
$2,314
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,420 | $8,140 |
$37,152
331,718
kWh
|
$4,268
-
kW-mo/yr
|
- | - | |
08 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $38,999 | $17,176 | - | - |
$38,999
-
MMBtu
|
- | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $14,026 | $5,000 | - | - |
$14,026
-
MMBtu
|
- | |
10 | 2.2136: Install / repair insulation on steam lines | $278 | $130 | - | - |
$278
-
MMBtu
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $234 | $150 |
$108
964
kWh
|
$7
-
kW-mo/yr
|
- | $119 | |
12 | 2.7135: Install occupancy sensors | $1,778 | $1,620 |
$1,778
15,876
kWh
|
- | - | - | |
13 | 2.7243: Improve air circulation with destratification fans / other methods | $1,970 | $2,556 | - | - |
$1,970
-
MMBtu
|
- | |
14 | 2.3212: Optimize plant power factor | $3,906 | $14,129 | - | - | - | $3,906 | |
TOTAL RECOMMENDED | $126,248 | $50,057 |
$50,698
452,673
kWh
|
$5,728
-
kW-mo/yr
|
$65,797
-
MMBtu
|
$4,025 | ||
TOTAL IMPLEMENTED | $67,082 | $16,395 |
$43,667
389,893
kWh
|
$5,105
-
kW-mo/yr
|
$18,310
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs