ITAC Assessment: SU0251
ITAC logo
ITAC Assessment: SU0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Converted Paper
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $50
M
to 100
M
# of Employees 189
Plant Area 195,448
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $514,073 4,587,977
kWh
Electricity Demand $83,854 12,535
kW-mo/yr
Electricity Fees $38,988 -
Natural Gas $922,659 69,776
MMBtu
Fuel Oil #6 $126,037 13,126
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,082

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,054 - $4,532
40,465
kWh
$522
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,682 - $2,327
20,779
kWh
$355
-
kW-mo/yr
- -
03 2.4314: Use synthetic lubricant $707 - $613
5,475
kWh
$94
-
kW-mo/yr
- -
04 2.6232: Install set-back timers $8,210 $457 - - $8,210
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,670 $480 $4,188
37,396
kWh
$482
-
kW-mo/yr
- -
06 2.2113: Repair or replace steam traps $2,314 $219 - - $2,314
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $41,420 $8,140 $37,152
331,718
kWh
$4,268
-
kW-mo/yr
- -
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $38,999 $17,176 - - $38,999
-
MMBtu
-
09 2.2414: Use waste heat from hot flue gases to preheat $14,026 $5,000 - - $14,026
-
MMBtu
-
10 2.2136: Install / repair insulation on steam lines $278 $130 - - $278
-
MMBtu
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $234 $150 $108
964
kWh
$7
-
kW-mo/yr
- $119
12 2.7135: Install occupancy sensors $1,778 $1,620 $1,778
15,876
kWh
- - -
13 2.7243: Improve air circulation with destratification fans / other methods $1,970 $2,556 - - $1,970
-
MMBtu
-
14 2.3212: Optimize plant power factor $3,906 $14,129 - - - $3,906
TOTAL RECOMMENDED $126,248 $50,057 $50,698
452,673
kWh
$5,728
-
kW-mo/yr
$65,797
-
MMBtu
$4,025
TOTAL IMPLEMENTED $67,082 $16,395 $43,667
389,893
kWh
$5,105
-
kW-mo/yr
$18,310
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs