ITAC Assessment: HO0197
ITAC logo
ITAC Assessment: HO0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Highly Loaded Additives
NAICS
n/a
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $5
M
to 10
M
# of Employees 17
Plant Area 47,000
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,768 695,193
kWh
Electricity Demand $27,539 3,039
kW-mo/yr
Electricity Fees $6 -
Natural Gas $2,045 266
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,532 $3,250 $1,025
12,603
kWh
$507
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $513 $492 $513
6,448
kWh
- -
03 2.2511: Insulate bare equipment $2,672 $144 $2,083
25,498
kWh
$589
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $5,901 $324 $5,901
72,098
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $431 $54 $336
4,103
kWh
$95
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $4,096 $5,000 $4,096
50,117
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,217 $720 $948
11,723
kWh
$269
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $802 $1,600 $802
9,965
kWh
- -
09 4.611: Begin a practice of predictive / preventative maintenance $10,000 $500 - - $10,000
10 4.424: Improve space comfort conditioning $12,000 $6,000 - - $12,000
11 3.4116: Meter recycled water (to reduce sewer charges) $4,150 $1,000 - - $4,150
TOTAL RECOMMENDED $43,314 $19,084 $15,704
192,555
kWh
$1,460
-
kW-mo/yr
$26,150
TOTAL IMPLEMENTED $36,061 $17,886 $13,285
162,954
kWh
$776
-
kW-mo/yr
$22,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs