ITAC Assessment: SU0249
ITAC logo
ITAC Assessment: SU0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product HDPE plastic piping
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 48,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,995 9,869,250
kWh
Electricity Demand $231,791 23,450
kW-mo/yr
Electricity Fees $9,259 -
Natural Gas $13,111 1,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4314: Use synthetic lubricant $2,139 - $1,378
29,952
kWh
$761
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,594 - $1,031
22,417
kWh
$563
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,329 - $944
20,530
kWh
$385
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,685 $289 $1,191
25,896
kWh
$494
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,727 $589 $1,926
41,870
kWh
$801
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $240 $334 $60
1,314
kWh
$20
-
kW-mo/yr
$160
07 2.7142: Utilize higher efficiency lamps and/or ballasts $10,719 $16,400 $7,586
164,923
kWh
$3,133
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,403 $19,107 $2,980
64,776
kWh
$1,423
-
kW-mo/yr
-
09 2.6211: Conserve energy by efficient use of vending machines $103 $457 $103
2,247
kWh
- -
TOTAL RECOMMENDED $24,939 $37,176 $17,199
373,925
kWh
$7,580
-
kW-mo/yr
$160
TOTAL IMPLEMENTED $22,697 $36,719 $15,718
341,726
kWh
$6,819
-
kW-mo/yr
$160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs