Assessment Year | 2006 |
---|---|
Principal Product | Gaskets, Seals and Expansion Joints |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 456 |
Plant Area |
650,000
ft2
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,208,747 | 12,859,043 |
kWh
|
$0.094 |
Electricity Demand | $5,220 | 26,098 |
kW-mo/yr
|
$0.20 |
Electricity Fees | $4,146 | - |
|
- |
Natural Gas | $1,251,751 | 117,872 |
MMBtu
|
$10.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $165,126 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $137,005 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,292 | - |
$7,271
77,351
kWh
|
$21
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,903 | - |
$1,896
20,173
kWh
|
$7
-
kW-mo/yr
|
- | - | - | - | |
03 | 4.821: Pay bills on time to avoid late fees | $546 | - | - | - | - | - | $546 | - | |
04 | 2.4314: Use synthetic lubricant | $260 | - |
$259
2,759
kWh
|
$1
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2135: Repair and eliminate steam leaks | $85,427 | $432 | - | - |
$85,427
-
MMBtu
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $6,276 | $515 |
$6,258
66,576
kWh
|
$18
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $38,806 | $6,280 |
$38,693
411,632
kWh
|
$113
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2136: Install / repair insulation on steam lines | $5,841 | $1,098 | - | - |
$5,841
-
MMBtu
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,730 | $1,952 |
$5,707
60,716
kWh
|
$23
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,967 | $4,730 |
$10,935
116,325
kWh
|
$32
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.6211: Conserve energy by efficient use of vending machines | $1,423 | $2,030 |
$1,423
15,140
kWh
|
- | - | - | - | - | |
12 | 2.7135: Install occupancy sensors | $566 | $823 |
$566
6,021
kWh
|
- | - | - | - | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $89 | $135 |
$33
350
kWh
|
- | - | $43 | - | $13 | |
TOTAL RECOMMENDED | $165,126 | $17,995 |
$73,041
777,043
kWh
|
$215
-
kW-mo/yr
|
$91,268
-
MMBtu
|
$43 | $546 | $13 | ||
TOTAL IMPLEMENTED | $137,005 | $10,720 |
$44,999
478,719
kWh
|
$136
-
kW-mo/yr
|
$91,268
-
MMBtu
|
$43 | $546 | $13 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs