ITAC Assessment: SU0243
ITAC logo
ITAC Assessment: SU0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Steel Joist and Decking
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $100
M
to 500
M
# of Employees 79
Plant Area 500,000
ft2
Annual Production 120,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $720,792 7,408,800
kWh
Electricity Demand $267,030 53,406
kW-mo/yr
Electricity Fees $2,452 -
Natural Gas $540,459 50,789
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,548 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7221: Lower temperature during the winter season and vice-versa $18,077 - - - $18,077
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,394 - $7,174
73,960
kWh
$1,220
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,730 - $1,435
14,790
kWh
$295
-
kW-mo/yr
- - -
04 2.4314: Use synthetic lubricant $1,147 - $952
9,810
kWh
$195
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $13,094 $636 $11,194
115,400
kWh
$1,900
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,352 $1,344 $6,367
65,640
kWh
$985
-
kW-mo/yr
- - -
07 2.6211: Conserve energy by efficient use of vending machines $438 $732 $408
4,205
kWh
$30
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $186 $428 $186
1,915
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $382 $912 $170
1,752
kWh
$10
-
kW-mo/yr
- $32 $170
10 2.7142: Utilize higher efficiency lamps and/or ballasts $39,436 $104,800 $34,151
352,080
kWh
$5,285
-
kW-mo/yr
- - -
11 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $23,312 $73,075 - - $23,312
-
MMBtu
- -
TOTAL RECOMMENDED $113,548 $181,927 $62,037
639,552
kWh
$9,920
-
kW-mo/yr
$41,389
-
MMBtu
$32 $170
TOTAL IMPLEMENTED $48,632 $3,320 $26,043
268,477
kWh
$4,310
-
kW-mo/yr
$18,077
-
MMBtu
$32 $170
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs