ITAC Assessment: SU0239
ITAC logo
ITAC Assessment: SU0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Folded packaging
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 39,000
ft2
Annual Production 6,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,997 2,210,800
kWh
Electricity Demand $54,696 6,752
kW-mo/yr
Electricity Fees $2,300 -
Natural Gas $7,491 570
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,082

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $13,600 - $9,320
96,079
kWh
$4,280
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,502 - $1,128
11,625
kWh
$374
-
kW-mo/yr
- - -
03 4.821: Pay bills on time to avoid late fees $1,365 - - - - - $1,365
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,985 $440 $3,878
39,975
kWh
$1,107
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,248 $371 $933
9,617
kWh
$315
-
kW-mo/yr
- - -
06 2.7132: Install timers on light switches in little used areas $84 $51 $84
861
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,577 $5,660 $4,395
45,306
kWh
$1,182
-
kW-mo/yr
- - -
08 2.6211: Conserve energy by efficient use of vending machines $166 $270 $136
1,402
kWh
$30
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $223 $487 $110
1,139
kWh
$30
-
kW-mo/yr
- $24 $59
10 2.3212: Optimize plant power factor $1,820 $6,664 - - $1,820 - -
TOTAL RECOMMENDED $30,570 $13,943 $19,984
206,004
kWh
$7,318
-
kW-mo/yr
$1,820 $24 $1,424
TOTAL IMPLEMENTED $27,082 $7,009 $18,720
192,977
kWh
$6,914
-
kW-mo/yr
- $24 $1,424
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings