Assessment Year | 2006 |
---|---|
Principal Product | Injection Molded Plastic |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
106,000
ft2
|
Annual Production | 200,000,000
pieces
|
Production Hrs. Annual | 8,064
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $783,559 | 10,406,400 |
kWh
|
$0.075 |
Electricity Demand | $169,340 | 21,904 |
kW-mo/yr
|
$7.73 |
Electricity Fees | $4,742 | - |
|
- |
Natural Gas | $7,970 | 81,550 |
MMBtu
|
$0.098 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,677 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,411 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,860 | - |
$2,500
33,090
kWh
|
$360
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $2,416 | $171 |
$2,158
28,560
kWh
|
$258
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $868 | $127 |
$868
11,491
kWh
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $4,245 | $713 | - | - |
$4,245
-
MMBtu
|
- | |
05 | 2.2113: Repair or replace steam traps | $1,176 | $365 | - | - |
$1,176
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $758 | $220 |
$677
8,960
kWh
|
$81
-
kW-mo/yr
|
- | - | |
07 | 2.7273: Install desiccant humidity control system | $65,227 | $70,000 |
$65,227
819,257
kWh
|
- | - | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $2,279 | $2,517 |
$(-264.0)
(-3,499)
kWh
|
$(-15.0)
-
kW-mo/yr
|
$2,558
-
MMBtu
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $656 | $1,314 |
$322
4,257
kWh
|
$18
-
kW-mo/yr
|
- | $316 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,858 | $12,200 |
$6,477
85,721
kWh
|
$381
-
kW-mo/yr
|
- | - | |
11 | 2.7233: Use properly designed and sized hvac equipment | $4,046 | $8,856 |
$1,166
15,426
kWh
|
$36
-
kW-mo/yr
|
$2,844
-
MMBtu
|
- | |
12 | 2.6211: Conserve energy by efficient use of vending machines | $288 | $701 |
$288
3,811
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $91,677 | $97,184 |
$79,419
1,007,074
kWh
|
$1,119
-
kW-mo/yr
|
$10,823
-
MMBtu
|
$316 | ||
TOTAL IMPLEMENTED | $81,411 | $86,142 |
$72,985
921,930
kWh
|
$447
-
kW-mo/yr
|
$7,979
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs