ITAC Assessment: SU0235
ITAC logo
ITAC Assessment: SU0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Heat Treated and Plated Metal
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 38,000
ft2
Annual Production 3,750,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,532 734,658
kWh
Electricity Demand $10,382 1,895
kW-mo/yr
Electricity Fees $3,261 -
Natural Gas $142,602 3,751
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $5,295 - - - - $5,295
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,954 - $1,779
13,079
kWh
$175
-
kW-mo/yr
- -
03 2.8118: Check for accuracy of utility / power meters $255 - - - - $255
04 2.4314: Use synthetic lubricant $247 - $225
1,653
kWh
$22
-
kW-mo/yr
- -
05 2.2113: Repair or replace steam traps $14,219 $1,527 - - $14,219
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $1,179 $25 - - $1,179
-
MMBtu
-
07 2.2136: Install / repair insulation on steam lines $42,734 $6,467 - - $42,734
-
MMBtu
-
08 2.2123: Insulate feedwater tank $3,650 $720 - - $3,650
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,629 $325 $1,481
10,891
kWh
$148
-
kW-mo/yr
- -
10 2.4221: Install compressor air intakes in coolest locations $1,221 $277 $1,111
8,168
kWh
$110
-
kW-mo/yr
- -
11 2.4222: Install adequate dryers on air lines to eliminate blowdown $22,111 $5,932 $(-1,283.0)
(-9,432)
kWh
$(-126.0)
-
kW-mo/yr
- $23,520
12 2.2414: Use waste heat from hot flue gases to preheat $13,611 $8,189 - - $13,611
-
MMBtu
-
13 2.1232: Keep boiler tubes clean $1,255 $720 - - $1,255
-
MMBtu
-
14 2.7142: Utilize higher efficiency lamps and/or ballasts $10,613 $9,400 $9,654
70,985
kWh
$959
-
kW-mo/yr
- -
TOTAL RECOMMENDED $119,973 $33,582 $12,967
95,344
kWh
$1,288
-
kW-mo/yr
$76,648
-
MMBtu
$29,070
TOTAL IMPLEMENTED $95,749 $15,993 $3,313
24,359
kWh
$329
-
kW-mo/yr
$63,037
-
MMBtu
$29,070
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs