Assessment Year | 2005 |
---|---|
Principal Product | Bare and Tinned Copper Wire and Cable |
NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 79 |
Plant Area |
120,000
ft2
|
Annual Production | 21,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $839,597 | 11,093,250 |
kWh
|
$0.076 |
Electricity Demand | $20,825 | 4,218 |
kW-mo/yr
|
$4.94 |
Electricity Fees | $10,705 | - |
|
- |
Natural Gas | $61,768 | 6,026 |
MMBtu
|
$10.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $119,736 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $19,304 | - |
$19,208
252,735
kWh
|
$96
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,426 | - |
$12,379
162,876
kWh
|
$47
-
kW-mo/yr
|
- | - | - | |
03 | 2.4314: Use synthetic lubricant | $5,978 | - |
$5,948
78,269
kWh
|
$30
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $6,658 | - |
$6,633
87,276
kWh
|
$25
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,300 | $770 |
$4,284
56,364
kWh
|
$16
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,961 | $20,200 |
$10,920
143,685
kWh
|
$41
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $785 | $1,422 |
$336
4,415
kWh
|
$1
-
kW-mo/yr
|
- | $120 | $328 | |
08 | 3.1191: Change procedures / equipment / operating conditions | $53,622 | $114,259 | - | - | - | $53,622 | - | |
09 | 2.6211: Conserve energy by efficient use of vending machines | $321 | $684 |
$320
4,205
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
10 | 2.3212: Optimize plant power factor | $5,381 | $33,320 | - | - | $5,381 | - | - | |
TOTAL RECOMMENDED | $119,736 | $170,655 |
$60,028
789,825
kWh
|
$257
-
kW-mo/yr
|
$5,381 | $53,742 | $328 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs