ITAC Assessment: SU0226
ITAC logo
ITAC Assessment: SU0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Bare and Tinned Copper Wire and Cable
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 79
Plant Area 120,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $839,597 11,093,250
kWh
Electricity Demand $20,825 4,218
kW-mo/yr
Electricity Fees $10,705 -
Natural Gas $61,768 6,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $19,304 - $19,208
252,735
kWh
$96
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $12,426 - $12,379
162,876
kWh
$47
-
kW-mo/yr
- - -
03 2.4314: Use synthetic lubricant $5,978 - $5,948
78,269
kWh
$30
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $6,658 - $6,633
87,276
kWh
$25
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,300 $770 $4,284
56,364
kWh
$16
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,961 $20,200 $10,920
143,685
kWh
$41
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $785 $1,422 $336
4,415
kWh
$1
-
kW-mo/yr
- $120 $328
08 3.1191: Change procedures / equipment / operating conditions $53,622 $114,259 - - - $53,622 -
09 2.6211: Conserve energy by efficient use of vending machines $321 $684 $320
4,205
kWh
$1
-
kW-mo/yr
- - -
10 2.3212: Optimize plant power factor $5,381 $33,320 - - $5,381 - -
TOTAL RECOMMENDED $119,736 $170,655 $60,028
789,825
kWh
$257
-
kW-mo/yr
$5,381 $53,742 $328
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs