ITAC Assessment: SU0224
ITAC logo
ITAC Assessment: SU0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Frozen Dairy Deserts
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $50
M
to 100
M
# of Employees 314
Plant Area 113,978
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 5,928
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $468,167 13,706,592
kWh
Electricity Demand $46,449 25,942
kW-mo/yr
Natural Gas $170,618 17,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $162,246

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $11,943 - - - - - $11,943
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,147 - $2,873
84,509
kWh
$274
-
kW-mo/yr
- - -
03 2.6218: Turn off equipment when not in use $3,039 - $2,505
73,685
kWh
$534
-
kW-mo/yr
- - -
04 2.4314: Use synthetic lubricant $553 - $481
14,155
kWh
$72
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $2,650 $958 $2,414
70,983
kWh
$236
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,340 $825 $2,165
63,673
kWh
$175
-
kW-mo/yr
- - -
07 2.1232: Keep boiler tubes clean $2,726 $1,466 - - $2,726
-
MMBtu
- -
08 2.7273: Install desiccant humidity control system $79,657 $50,307 - - $4,657
-
MMBtu
$75,000 -
09 2.7273: Install desiccant humidity control system $43,464 $52,154 $27,904
820,693
kWh
$247
-
kW-mo/yr
$15,313
-
MMBtu
- -
10 2.2414: Use waste heat from hot flue gases to preheat $8,736 $14,580 - - $8,736
-
MMBtu
- -
11 2.6211: Conserve energy by efficient use of vending machines $77 $348 $72
2,102
kWh
$5
-
kW-mo/yr
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $2,037 $11,000 $1,840
54,123
kWh
$197
-
kW-mo/yr
- - -
13 2.7314: Reduce ventilation air $2,430 $15,374 $2,409
70,842
kWh
$21
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $162,799 $147,012 $42,663
1,254,765
kWh
$1,761
-
kW-mo/yr
$31,432
-
MMBtu
$75,000 $11,943
TOTAL IMPLEMENTED $162,246 $147,012 $42,182
1,240,610
kWh
$1,689
-
kW-mo/yr
$31,432
-
MMBtu
$75,000 $11,943
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs