ITAC Assessment: CO0540
ITAC logo
ITAC Assessment: CO0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Asphalt paving mixtures
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 60,000
ft2
Annual Production 500,000
ton
Production Hrs. Annual 3,627
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,196 2,289,155
kWh
Electricity Demand $195,071 13,985
kW-mo/yr
Electricity Fees $1,500 -
Natural Gas $370,578 81,172
MMBtu
Fuel Oil #2 $27,985 3,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,340 $8,790 $1,960
74,500
kWh
$4,380
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $5,600 $18,700 - - - $5,600
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,710 $200 $1,020
38,400
kWh
$1,690
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $579 $1,136 $180
6,809
kWh
$399
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $1,310 $200 - - $1,310
-
MMBtu
-
06 2.1133: Adjust burners for efficient operation $1,020 $500 - - - $1,020
-
MMBtu
TOTAL RECOMMENDED $17,559 $29,526 $3,160
119,709
kWh
$6,469
-
kW-mo/yr
$1,310
-
MMBtu
$6,620
-
MMBtu
TOTAL IMPLEMENTED $11,959 $10,826 $3,160
119,709
kWh
$6,469
-
kW-mo/yr
$1,310
-
MMBtu
$1,020
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs