Assessment Year | 2005 |
---|---|
Principal Product | Concrete Block |
NAICS | 327331: Concrete Block and Brick Manufacturing |
SIC | 3271: Concrete Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
40,249
ft2
|
Annual Production | 8,500,000
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,705 | 681,473 |
kWh
|
$0.092 |
Electricity Demand | $48,283 | 3,742 |
kW-mo/yr
|
$12.90 |
Electricity Fees | $5,089 | - |
|
- |
Natural Gas | $49,195 | 6,519 |
MMBtu
|
$7.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,926 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,049 | - |
$1,133
12,314
kWh
|
$916
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,264 | - |
$903
9,818
kWh
|
$361
-
kW-mo/yr
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,058 | - |
$684
7,433
kWh
|
$374
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,712 | $488 |
$2,641
28,704
kWh
|
$1,071
-
kW-mo/yr
|
|
05 | 2.4314: Use synthetic lubricant | $1,814 | $1,000 |
$1,182
12,852
kWh
|
$632
-
kW-mo/yr
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $1,078 | $579 |
$691
7,509
kWh
|
$387
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $10,975 | $2,067 |
$7,234
78,630
kWh
|
$3,741
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $8,926 | $2,067 |
$6,101
66,316
kWh
|
$2,825
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs