| Assessment Year | 2005 |
|---|---|
| Principal Product | Concrete Block |
| NAICS | 327331: Concrete Block and Brick Manufacturing |
| SIC | 3271: Concrete Block and Brick |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
40,249
ft2
|
| Annual Production | 8,500,000
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $62,705 | 681,473 |
kWh
|
$0.092 |
| Electricity Demand | $48,283 | 3,742 |
kW-mo/yr
|
$12.90 |
| Electricity Fees | $5,089 | - |
|
- |
| Natural Gas | $49,195 | 6,519 |
MMBtu
|
$7.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,926 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,049 | - |
$1,133
12,314
kWh
|
$916
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,264 | - |
$903
9,818
kWh
|
$361
-
kW-mo/yr
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,058 | - |
$684
7,433
kWh
|
$374
-
kW-mo/yr
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,712 | $488 |
$2,641
28,704
kWh
|
$1,071
-
kW-mo/yr
|
|
| 05 | 2.4314: Use synthetic lubricant | $1,814 | $1,000 |
$1,182
12,852
kWh
|
$632
-
kW-mo/yr
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,078 | $579 |
$691
7,509
kWh
|
$387
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $10,975 | $2,067 |
$7,234
78,630
kWh
|
$3,741
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $8,926 | $2,067 |
$6,101
66,316
kWh
|
$2,825
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs