Assessment Year | 2005 |
---|---|
Principal Product | HVAC Equipment |
NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $50 M to 100M |
# of Employees | 429 |
Plant Area |
435,000
ft2
|
Annual Production | 20,000
pieces
|
Production Hrs. Annual | 4,284
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $616,694 | 7,708,680 |
kWh
|
$0.080 |
Electricity Demand | $850,752 | 70,896 |
kW-mo/yr
|
$12.00 |
Natural Gas | $647,748 | 91,762 |
MMBtu
|
$7.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,534 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,662 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $243 | - |
$135
1,692
kWh
|
$108
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,788 | - |
$5,484
68,544
kWh
|
$2,304
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,637 | - |
$5,233
65,417
kWh
|
$4,404
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $8,167 | $595 |
$4,435
55,435
kWh
|
$3,732
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,070 | $1,125 |
$4,270
53,379
kWh
|
$1,800
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,629 | $1,881 |
$746
9,321
kWh
|
$156
-
kW-mo/yr
|
$1,727 | |
TOTAL RECOMMENDED | $34,534 | $3,601 |
$20,303
253,788
kWh
|
$12,504
-
kW-mo/yr
|
$1,727 | ||
TOTAL IMPLEMENTED | $31,662 | $1,720 |
$19,422
242,775
kWh
|
$12,240
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs