ITAC Assessment: SU0205
ITAC logo
ITAC Assessment: SU0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Carbonated and non-carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 440,000
ft2
Annual Production 115,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $780,255 11,408,280
kWh
Electricity Demand $368,417 30,701
kW-mo/yr
Natural Gas $374,978 58,066
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,225,454 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $15,784 - $12,772
182,453
kWh
$3,012
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,184 - $5,816
83,081
kWh
$1,368
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,803 $75 $1,455
20,787
kWh
$348
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $11,271 $560 $9,123
130,324
kWh
$2,148
-
kW-mo/yr
-
05 2.4314: Use synthetic lubricant $5,926 $1,000 $4,798
68,542
kWh
$1,128
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $822 $1,010 $822
11,741
kWh
- -
07 4.212: Adopt in-house material generation $2,182,664 $3,516,395 $(-351,012.0)
(-5,014,464)
kWh
$(-82,656.0)
-
kW-mo/yr
$2,616,332
TOTAL RECOMMENDED $2,225,454 $3,519,040 $(-316,226.0)
(-4,517,536)
kWh
$(-74,652.0)
-
kW-mo/yr
$2,616,332
TOTAL IMPLEMENTED $24,335 $2,085 $19,847
283,523
kWh
$4,488
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs