ITAC Assessment: SU0204
ITAC logo
ITAC Assessment: SU0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Garden Sprayers
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 160,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,314 4,297,127
kWh
Electricity Demand $142,980 9,349
kW-mo/yr
Electricity Fees $12,573 -
Natural Gas $33,859 3,596
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,324 - $1,918
56,402
kWh
$1,406
-
kW-mo/yr
- -
02 2.7124: Make a practice of turning off lights when not needed $938 - $938
27,594
kWh
- - -
03 2.8114: Change rate schedules or other changes in utility service $677 - - - - $677
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $175 - $99
2,901
kWh
$76
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $1,158 $344 $669
19,682
kWh
$489
-
kW-mo/yr
- -
06 2.7124: Make a practice of turning off lights when not needed $1,236 $748 $671
19,728
kWh
$565
-
kW-mo/yr
- -
07 2.4314: Use synthetic lubricant $3,145 $2,000 $1,815
53,391
kWh
$1,330
-
kW-mo/yr
- -
08 2.3212: Optimize plant power factor $3,731 $11,931 - - $3,731 -
TOTAL RECOMMENDED $14,384 $15,023 $6,110
179,698
kWh
$3,866
-
kW-mo/yr
$3,731 $677
TOTAL IMPLEMENTED $3,320 $2,000 $1,914
56,292
kWh
$1,406
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs