Assessment Year | 2003 |
---|---|
Principal Product | Green Lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $1 M to 5M |
# of Employees | 60 |
Plant Area |
37,000
ft2
|
Annual Production | 8,000
thousand feet
|
Production Hrs. Annual | 2,410
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,517 | 1,647,847 |
kWh
|
$0.066 |
Electricity Demand | $44,300 | 7,308 |
kW-mo/yr
|
$6.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,506 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $207 | - |
$102
1,738
kWh
|
$105
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $801 | $2,160 |
$504
12,934
kWh
|
$297
-
kW-mo/yr
|
|
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $7,007 | $915 |
$3,953
101,378
kWh
|
$3,054
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,172 | $30 |
$663
17,009
kWh
|
$509
-
kW-mo/yr
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,218 | $2,025 |
$3,506
89,951
kWh
|
$2,712
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,095 | $250 |
$617
15,857
kWh
|
$478
-
kW-mo/yr
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $406 | $405 |
$228
5,900
kWh
|
$178
-
kW-mo/yr
|
|
08 | 2.4239: Eliminate or reduce compressed air usage | $1,600 | $40 |
$902
23,134
kWh
|
$698
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $18,506 | $5,825 |
$10,475
267,901
kWh
|
$8,031
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $16,500 | $5,380 |
$9,345
238,867
kWh
|
$7,155
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs