ITAC Assessment: SU0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Commercial and Residential Lawnmowers
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 323
Plant Area 135,000
ft2
Annual Production 23,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,864 2,394,000
kWh
Electricity Demand $76,905 5,908
kW-mo/yr
Natural Gas $201,164 28,497
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,601

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,139 - $592
7,588
kWh
$547
-
kW-mo/yr
- -
02 2.8114: Change rate schedules or other changes in utility service $9,582 - - - - $9,582
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,367 $366 $1,781
22,828
kWh
$586
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,129 $308 $647
8,294
kWh
$482
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,105 $960 $717
9,198
kWh
$169
-
kW-mo/yr
- $1,219
06 2.7135: Install occupancy sensors $1,344 $1,090 $1,344
17,228
kWh
- - -
07 3.6122: Install solid waste incinerator for heat $16,477 $25,850 $(-70.0)
(-893)
kWh
$(-91.0)
-
kW-mo/yr
$2,238
-
MMBtu
$14,400
TOTAL RECOMMENDED $34,143 $28,574 $5,011
64,243
kWh
$1,693
-
kW-mo/yr
$2,238
-
MMBtu
$25,201
TOTAL IMPLEMENTED $5,601 $1,634 $3,145
40,320
kWh
$1,237
-
kW-mo/yr
- $1,219
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs