ITAC Assessment: SU0195
ITAC logo
ITAC Assessment: SU0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Pressure, Force, Vibration and Torque Sensors
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 294
Plant Area 110,000
ft2
Annual Production 113,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,227 2,821,821
kWh
Electricity Demand $51,760 6,413
kW-mo/yr
Natural Gas $39,546 4,662
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,212

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $11,293 - - - $11,293
02 3.1191: Change procedures / equipment / operating conditions $333 - $261
6,516
kWh
$72
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,236 $1,380 $4,493
112,320
kWh
$1,743
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $3,836 $1,837 $3,005
75,130
kWh
$831
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,140 $555 $849
21,216
kWh
$291
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,838 $3,772 $8,608
215,182
kWh
$2,937
-
kW-mo/yr
$11,293
TOTAL IMPLEMENTED $11,212 $3,772 $8,347
208,666
kWh
$2,865
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs