ITAC Assessment: SU0190
ITAC logo
ITAC Assessment: SU0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Newspaper Publishing
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 62,080
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 5,148
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,786 943,840
kWh
Electricity Demand $28,927 1,942
kW-mo/yr
Natural Gas $14,979 1,735
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $1,548 - $743
16,146
kWh
$805
-
kW-mo/yr
- - -
02 2.8114: Change rate schedules or other changes in utility service $3,782 - - - - - $3,782
03 2.4231: Reduce the pressure of compressed air to the minimum required $205 - $116
2,523
kWh
$89
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $891 $180 $504
10,965
kWh
$387
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $97 $108 $52
1,133
kWh
$45
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $361 $500 $29
630
kWh
$15
-
kW-mo/yr
- $264 $53
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,329 $3,430 $703
15,288
kWh
$626
-
kW-mo/yr
- - -
08 2.2414: Use waste heat from hot flue gases to preheat $3,600 $19,500 - - $3,600
-
MMBtu
- -
TOTAL RECOMMENDED $11,813 $23,718 $2,147
46,685
kWh
$1,967
-
kW-mo/yr
$3,600
-
MMBtu
$264 $3,835
TOTAL IMPLEMENTED $6,523 $288 $1,415
30,767
kWh
$1,326
-
kW-mo/yr
- - $3,782
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs