ITAC Assessment: MA0740
ITAC logo
ITAC Assessment: MA0740
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Composite parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 31,750
ft2
Annual Production 29
pieces
Production Hrs. Annual 6,146
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,942 2,123,047
kWh
Electricity Demand $88,132 7,297
kW-mo/yr
Electricity Fees $11,792 -
Natural Gas $29,458 1,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $18,853 $200 - $18,853 -
02 2.2136: Install / repair insulation on steam lines $5,057 $4,200 $5,057
49,236
kWh
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $4,672 $11,200 $4,672
45,487
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,745 $6,695 $3,745
36,467
kWh
- -
05 2.7314: Reduce ventilation air $3,084 $2,450 $1,016
9,889
kWh
- $2,068
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,904 $1,425 $2,904
28,276
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,652 $5,375 $2,652
25,820
kWh
- -
08 2.1113: Reduce combustion air flow to optimum $1,775 $2,010 $1,775
17,284
kWh
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $426 $500 $426
4,147
kWh
- -
TOTAL RECOMMENDED $43,168 $34,055 $22,247
216,606
kWh
$18,853 $2,068
-
MMBtu
TOTAL IMPLEMENTED $40,516 $28,680 $19,595
190,786
kWh
$18,853 $2,068
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs