Assessment Year | 2015 |
---|---|
Principal Product | Composite parts |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
31,750
ft2
|
Annual Production | 29
pieces
|
Production Hrs. Annual | 6,146
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,942 | 2,123,047 |
kWh
|
$0.10 |
Electricity Demand | $88,132 | 7,297 |
kW-mo/yr
|
$12.08 |
Electricity Fees | $11,792 | - |
|
- |
Natural Gas | $29,458 | 1,022 |
MMBtu
|
$28.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,168 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $40,516 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $18,853 | $200 | - | $18,853 | - | |
02 | 2.2136: Install / repair insulation on steam lines | $5,057 | $4,200 |
$5,057
49,236
kWh
|
- | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,672 | $11,200 |
$4,672
45,487
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,745 | $6,695 |
$3,745
36,467
kWh
|
- | - | |
05 | 2.7314: Reduce ventilation air | $3,084 | $2,450 |
$1,016
9,889
kWh
|
- |
$2,068
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,904 | $1,425 |
$2,904
28,276
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,652 | $5,375 |
$2,652
25,820
kWh
|
- | - | |
08 | 2.1113: Reduce combustion air flow to optimum | $1,775 | $2,010 |
$1,775
17,284
kWh
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $426 | $500 |
$426
4,147
kWh
|
- | - | |
TOTAL RECOMMENDED | $43,168 | $34,055 |
$22,247
216,606
kWh
|
$18,853 |
$2,068
-
MMBtu
|
||
TOTAL IMPLEMENTED | $40,516 | $28,680 |
$19,595
190,786
kWh
|
$18,853 |
$2,068
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs