ITAC Assessment: BD0481
ITAC logo
ITAC Assessment: BD0481
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Pet foods, dried fruit, baby foods
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 115,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,205 2,419,096
kWh
Electricity Demand $39,470 6,221
kW-mo/yr
Electricity Fees $1,520 -
Natural Gas $10,095 1,863
MMBtu
LPG $10,853 597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,666

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.8227: Adjust / maintain fork lift trucks for most efficient operation $8,603 $10,500 $(-2,250.0)
(-54,600)
kWh
- $10,853
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,932 $50 $1,517
36,817
kWh
$415
-
kW-mo/yr
-
03 2.3137: Use power during off-peak periods $915 $100 - $915
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $902 $3,944 $708
17,188
kWh
$194
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $764 $600 $672
16,311
kWh
$92
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $760 $1,040 $557
13,512
kWh
$203
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $194 $425 $142
3,433
kWh
$52
-
kW-mo/yr
-
TOTAL RECOMMENDED $14,070 $16,659 $1,346
32,661
kWh
$1,871
-
kW-mo/yr
$10,853
-
MMBtu
TOTAL IMPLEMENTED $1,666 $4,544 $1,380
33,499
kWh
$286
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs