ITAC Assessment: SU0189
ITAC logo
ITAC Assessment: SU0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Corrugated Containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 120,000
ft2
Annual Production 32,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,420 3,773,455
kWh
Electricity Demand $115,489 10,928
kW-mo/yr
Natural Gas $368,226 51,367
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,134

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,275 - $3,394
62,845
kWh
$1,881
-
kW-mo/yr
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $1,940 - $693
12,833
kWh
$1,247
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $4,291 $378 $2,759
51,093
kWh
$1,532
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,591 $1,175 $2,830
52,416
kWh
$761
-
kW-mo/yr
- -
05 2.1331: Burn a less expensive grade of fuel $49,312 $60,000 - - $368,301
-
MMBtu
$(-318,989.0)
-
MMBtu
06 2.2437: Recover waste heat from equipment $36,510 $45,708 - - $36,510
-
MMBtu
-
TOTAL RECOMMENDED $100,919 $107,261 $9,676
179,187
kWh
$5,421
-
kW-mo/yr
$404,811
-
MMBtu
$(-318,989.0)
-
MMBtu
TOTAL IMPLEMENTED $59,134 $61,553 $6,282
116,342
kWh
$3,540
-
kW-mo/yr
$368,301
-
MMBtu
$(-318,989.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs