| Assessment Year | 2004 |
|---|---|
| Principal Product | Corrugated Containers |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 86 |
| Plant Area |
120,000
ft2
|
| Annual Production | 32,000
ton
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $202,420 | 3,773,455 |
kWh
|
$0.054 |
| Electricity Demand | $115,489 | 10,928 |
kW-mo/yr
|
$10.57 |
| Natural Gas | $368,226 | 51,367 |
MMBtu
|
$7.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $100,919 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $59,134 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,275 | - |
$3,394
62,845
kWh
|
$1,881
-
kW-mo/yr
|
- | - | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,940 | - |
$693
12,833
kWh
|
$1,247
-
kW-mo/yr
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $4,291 | $378 |
$2,759
51,093
kWh
|
$1,532
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,591 | $1,175 |
$2,830
52,416
kWh
|
$761
-
kW-mo/yr
|
- | - | |
| 05 | 2.1331: Burn a less expensive grade of fuel | $49,312 | $60,000 | - | - |
$368,301
-
MMBtu
|
$(-318,989.0)
-
MMBtu
|
|
| 06 | 2.2437: Recover waste heat from equipment | $36,510 | $45,708 | - | - |
$36,510
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $100,919 | $107,261 |
$9,676
179,187
kWh
|
$5,421
-
kW-mo/yr
|
$404,811
-
MMBtu
|
$(-318,989.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $59,134 | $61,553 |
$6,282
116,342
kWh
|
$3,540
-
kW-mo/yr
|
$368,301
-
MMBtu
|
$(-318,989.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs