ITAC Assessment: SU0185
ITAC logo
ITAC Assessment: SU0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Molded Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 66,483
ft2
Annual Production 78,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,255 2,738,997
kWh
Electricity Demand $103,494 8,150
kW-mo/yr
Electricity Fees $19,515 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,033

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6231: Utilize controls to operate equipment only when needed $95,123 - $73,698
921,225
kWh
$21,425
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $19,053 - $15,639
195,485
kWh
$3,414
-
kW-mo/yr
03 2.7135: Install occupancy sensors $345 $30 $268
3,354
kWh
$77
-
kW-mo/yr
04 2.4131: Size electric motors for peak operating efficiency $8,959 $92 $7,359
91,993
kWh
$1,600
-
kW-mo/yr
05 2.2511: Insulate bare equipment $5,163 $1,069 $5,163
64,532
kWh
-
06 2.7135: Install occupancy sensors $9,676 $30,734 $9,173
114,660
kWh
$503
-
kW-mo/yr
TOTAL RECOMMENDED $138,319 $31,925 $111,300
1,391,249
kWh
$27,019
-
kW-mo/yr
TOTAL IMPLEMENTED $38,033 $30,856 $32,439
405,492
kWh
$5,594
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs