ITAC Assessment: SU0184
ITAC logo
ITAC Assessment: SU0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Dairy Products
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 440
Plant Area 200,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $777,562 12,082,139
kWh
Electricity Demand $178,455 26,236
kW-mo/yr
Natural Gas $272,122 36,447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,153

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,982 - $7,602
118,045
kWh
$2,380
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,593 $1,000 $6,682
103,763
kWh
$911
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $3,478 $574 $2,458
38,172
kWh
$1,020
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $8,876 $2,584 $7,115
110,476
kWh
$1,761
-
kW-mo/yr
-
05 2.3212: Optimize plant power factor $5,619 $2,410 - - $5,619
06 2.4314: Use synthetic lubricant $2,480 $2,000 $2,191
34,024
kWh
$289
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,570 $26,324 $13,598
211,147
kWh
$1,972
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,125 $15,744 $3,601
55,910
kWh
$524
-
kW-mo/yr
-
TOTAL RECOMMENDED $57,723 $50,636 $43,247
671,537
kWh
$8,857
-
kW-mo/yr
$5,619
TOTAL IMPLEMENTED $42,153 $24,312 $29,649
460,390
kWh
$6,885
-
kW-mo/yr
$5,619
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs