| Assessment Year | 2004 |
|---|---|
| Principal Product | Dairy Products |
| NAICS | 311511: Fluid Milk Manufacturing |
| SIC | 2026: Fluid Milk |
| Sales Range | $50 M to 100M |
| # of Employees | 440 |
| Plant Area |
200,000
ft2
|
| Annual Production | 30,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $777,562 | 12,082,139 |
kWh
|
$0.064 |
| Electricity Demand | $178,455 | 26,236 |
kW-mo/yr
|
$6.80 |
| Natural Gas | $272,122 | 36,447 |
MMBtu
|
$7.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $57,723 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $42,153 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,982 | - |
$7,602
118,045
kWh
|
$2,380
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,593 | $1,000 |
$6,682
103,763
kWh
|
$911
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $3,478 | $574 |
$2,458
38,172
kWh
|
$1,020
-
kW-mo/yr
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $8,876 | $2,584 |
$7,115
110,476
kWh
|
$1,761
-
kW-mo/yr
|
- | |
| 05 | 2.3212: Optimize plant power factor | $5,619 | $2,410 | - | - | $5,619 | |
| 06 | 2.4314: Use synthetic lubricant | $2,480 | $2,000 |
$2,191
34,024
kWh
|
$289
-
kW-mo/yr
|
- | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,570 | $26,324 |
$13,598
211,147
kWh
|
$1,972
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,125 | $15,744 |
$3,601
55,910
kWh
|
$524
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $57,723 | $50,636 |
$43,247
671,537
kWh
|
$8,857
-
kW-mo/yr
|
$5,619 | ||
| TOTAL IMPLEMENTED | $42,153 | $24,312 |
$29,649
460,390
kWh
|
$6,885
-
kW-mo/yr
|
$5,619 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs