ITAC Assessment: SU0183
ITAC logo
ITAC Assessment: SU0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Metal Rings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 166,116
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,910 1,982,836
kWh
Electricity Demand $94,925 8,378
kW-mo/yr
Electricity Fees $1,121 -
Natural Gas $370,178 71,307
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,193

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 4.731: Advertise product or service $83,900 - - - - $83,900
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,014 - $2,008
41,068
kWh
$1,006
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $331 - $331
6,780
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,663 $502 $997
20,384
kWh
$666
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,191 $680 $793
16,225
kWh
$398
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $18,502 $12,517 - - $18,502
-
MMBtu
-
07 2.7135: Install occupancy sensors $483 $523 $336
6,864
kWh
$147
-
kW-mo/yr
- -
08 2.7491: Insulate glazing, walls, ceilings, and roofs $11,288 $16,817 - - $11,288
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,121 $25,260 $3,070
62,783
kWh
$2,051
-
kW-mo/yr
- -
TOTAL RECOMMENDED $125,493 $56,299 $7,535
154,104
kWh
$4,268
-
kW-mo/yr
$29,790
-
MMBtu
$83,900
TOTAL IMPLEMENTED $97,193 $18,020 $1,460
29,869
kWh
$545
-
kW-mo/yr
$11,288
-
MMBtu
$83,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs