ITAC Assessment: SU0182
ITAC logo
ITAC Assessment: SU0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Glass envelopes for lighting products
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 360,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $617,197 12,474,000
kWh
Electricity Demand $90,755 21,301
kW-mo/yr
Electricity Fees $9,684 -
Natural Gas $401,312 94,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,464

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $26,427 - $21,907
438,134
kWh
$4,520
-
kW-mo/yr
02 2.6231: Utilize controls to operate equipment only when needed $174 - $140
2,803
kWh
$34
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $8,773 $381 $7,278
145,569
kWh
$1,495
-
kW-mo/yr
04 2.4314: Use synthetic lubricant $3,517 $1,200 $3,023
60,466
kWh
$494
-
kW-mo/yr
05 2.7135: Install occupancy sensors $2,158 $1,678 $1,873
37,465
kWh
$285
-
kW-mo/yr
TOTAL RECOMMENDED $41,049 $3,259 $34,221
684,437
kWh
$6,828
-
kW-mo/yr
TOTAL IMPLEMENTED $12,464 $1,581 $10,441
208,838
kWh
$2,023
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs