Assessment Year | 2003 |
---|---|
Principal Product | paint |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
68,500
ft2
|
Annual Production | 625,000
Tgal
|
Production Hrs. Annual | 4,210
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,526 | 587,129 |
kWh
|
$0.086 |
Electricity Demand | $34,136 | 2,703 |
kW-mo/yr
|
$12.63 |
Natural Gas | $56,382 | 7,561 |
MMBtu
|
$7.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,211 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,126 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $1,400 | - | - | - | - | $1,400 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,210 | - |
$636
7,382
kWh
|
$574
-
kW-mo/yr
|
- | - | - | |
03 | 4.731: Advertise product or service | $31,250 | $1,000 | - | - | - | - | $31,250 | |
04 | 2.2437: Recover waste heat from equipment | $3,181 | $47 | - | - |
$3,181
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $466 | $57 |
$266
3,089
kWh
|
$200
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,229 | $185 |
$714
8,289
kWh
|
$515
-
kW-mo/yr
|
- | - | - | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $21,666 | $16,761 |
$9,133
106,080
kWh
|
$3,637
-
kW-mo/yr
|
- | $8,896 | - | |
08 | 2.1224: Replace boiler | $10,809 | $33,514 | - | - |
$10,809
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $71,211 | $51,564 |
$10,749
124,840
kWh
|
$4,926
-
kW-mo/yr
|
$13,990
-
MMBtu
|
$10,296 | $31,250 | ||
TOTAL IMPLEMENTED | $36,126 | $1,289 |
$980
11,378
kWh
|
$715
-
kW-mo/yr
|
$3,181
-
MMBtu
|
- | $31,250 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs