ITAC Assessment: SU0170
ITAC logo
ITAC Assessment: SU0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product paint
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 68,500
ft2
Annual Production 625,000
Tgal
Production Hrs. Annual 4,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,526 587,129
kWh
Electricity Demand $34,136 2,703
kW-mo/yr
Natural Gas $56,382 7,561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,211 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 4.652: Replace existing equipment with more suitable substitutes $1,400 - - - - $1,400 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,210 - $636
7,382
kWh
$574
-
kW-mo/yr
- - -
03 4.731: Advertise product or service $31,250 $1,000 - - - - $31,250
04 2.2437: Recover waste heat from equipment $3,181 $47 - - $3,181
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $466 $57 $266
3,089
kWh
$200
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,229 $185 $714
8,289
kWh
$515
-
kW-mo/yr
- - -
07 2.2614: Use cooling tower or economizer to replace chiller cooling $21,666 $16,761 $9,133
106,080
kWh
$3,637
-
kW-mo/yr
- $8,896 -
08 2.1224: Replace boiler $10,809 $33,514 - - $10,809
-
MMBtu
- -
TOTAL RECOMMENDED $71,211 $51,564 $10,749
124,840
kWh
$4,926
-
kW-mo/yr
$13,990
-
MMBtu
$10,296 $31,250
TOTAL IMPLEMENTED $36,126 $1,289 $980
11,378
kWh
$715
-
kW-mo/yr
$3,181
-
MMBtu
- $31,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs