ITAC Assessment: OKO952
ITAC logo
ITAC Assessment: OKO952
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product SYP Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 241,500
ft2
Annual Production 220
units
Production Hrs. Annual 4,990
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $786,599 20,764,800
kWh
Electricity Demand $328,909 44,329
kW-mo/yr
Waste Disposal Costs
Water Usage $12,261 6,897
Tgal
TOTAL YEARLY COSTS $1,127,769
RECOMMENDED SAVINGS* $120,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,689

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,072 $32,000 $39,072
1,028,321
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $29,900 $37,940 $20,343
535,409
kWh
$9,557
-
kW-mo/yr
-
03 2.4312: Improve lubrication practices $7,312 - $6,990
183,937
kWh
$3,282
-
kW-mo/yr
$(-2,960.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,021 $29,085 $8,216
216,216
kWh
$2,805
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,284 $6,222 $955
25,122
kWh
$329
-
kW-mo/yr
-
06 2.3212: Optimize plant power factor $21,399 $82,500 - - $21,399
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,312 - $16,762
441,116
kWh
- $(-6,450.0)
08 2.6232: Install set-back timers $151 $160 $151
3,973
kWh
- -
TOTAL RECOMMENDED $120,451 $187,907 $92,489
2,434,094
kWh
$15,973
-
kW-mo/yr
$11,989
TOTAL IMPLEMENTED $61,689 $67,307 $65,005
1,710,775
kWh
$3,134
-
kW-mo/yr
$(-6,450.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs