ITAC Assessment: SU0168
ITAC logo
ITAC Assessment: SU0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Custom thermoformed plastic component parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 68,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,216 964,000
kWh
Electricity Demand $48,480 4,105
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,134

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3137: Use power during off-peak periods $5,551 - - $4,691
-
kW-mo/yr
- $860
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,251 - $1,514
21,632
kWh
$737
-
kW-mo/yr
- -
03 2.3132: Recharge batteries on during off-peak demand periods $1,295 - - $1,156
-
kW-mo/yr
- $139
04 2.4221: Install compressor air intakes in coolest locations $1,662 $85 $1,119
15,980
kWh
$543
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,037 $227 $1,847
16,536
kWh
$1,190
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,579 $9,450 $7,942
113,461
kWh
$3,637
-
kW-mo/yr
- -
07 2.1211: Move boiler to more efficient location $5,735 $18,000 $3,002
43,030
kWh
$4,691
-
kW-mo/yr
$(-1,958.0)
-
MMBtu
-
TOTAL RECOMMENDED $31,110 $27,762 $15,424
210,639
kWh
$16,645
-
kW-mo/yr
$(-1,958.0)
-
MMBtu
$999
TOTAL IMPLEMENTED $12,134 $227 $3,361
38,168
kWh
$7,774
-
kW-mo/yr
- $999
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs