Assessment Year | 2003 |
---|---|
Principal Product | Custom thermoformed plastic component parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
68,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,216 | 964,000 |
kWh
|
$0.065 |
Electricity Demand | $48,480 | 4,105 |
kW-mo/yr
|
$11.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,134 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $5,551 | - | - |
$4,691
-
kW-mo/yr
|
- | $860 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,251 | - |
$1,514
21,632
kWh
|
$737
-
kW-mo/yr
|
- | - | |
03 | 2.3132: Recharge batteries on during off-peak demand periods | $1,295 | - | - |
$1,156
-
kW-mo/yr
|
- | $139 | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,662 | $85 |
$1,119
15,980
kWh
|
$543
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,037 | $227 |
$1,847
16,536
kWh
|
$1,190
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,579 | $9,450 |
$7,942
113,461
kWh
|
$3,637
-
kW-mo/yr
|
- | - | |
07 | 2.1211: Move boiler to more efficient location | $5,735 | $18,000 |
$3,002
43,030
kWh
|
$4,691
-
kW-mo/yr
|
$(-1,958.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $31,110 | $27,762 |
$15,424
210,639
kWh
|
$16,645
-
kW-mo/yr
|
$(-1,958.0)
-
MMBtu
|
$999 | ||
TOTAL IMPLEMENTED | $12,134 | $227 |
$3,361
38,168
kWh
|
$7,774
-
kW-mo/yr
|
- | $999 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs