ITAC Assessment: TA0087
ITAC logo
ITAC Assessment: TA0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fats&Oils,Edible
NAICS 311225: Fats and Oils Refining and Blending
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 95,000
ft2
Annual Production 100,000
lb
Production Hrs. Annual 5,296
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,675 7,252,085
kWh
Electricity Demand $76,837 18,030
kW-mo/yr
Electricity Fees $2,123 -
Natural Gas $144,705 24,696
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,188

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $25,212 $8,570 - - $25,212
-
MMBtu
02 2.2163: Use minimum steam operating pressure $6,220 - - - $6,220
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $4,750 $1,125 - - $4,750
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,391 $375 $3,621
62,023
kWh
$770
-
kW-mo/yr
-
05 2.2163: Use minimum steam operating pressure $3,275 - - - $3,275
-
MMBtu
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,900 - - $1,900
-
kW-mo/yr
-
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,340 - $1,340
22,915
kWh
- -
08 2.2511: Insulate bare equipment $980 $200 $980
16,852
kWh
- -
TOTAL RECOMMENDED $48,068 $10,270 $5,941
101,790
kWh
$2,670
-
kW-mo/yr
$39,457
-
MMBtu
TOTAL IMPLEMENTED $45,188 $10,070 $4,961
84,938
kWh
$770
-
kW-mo/yr
$39,457
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs