Assessment Year | 2004 |
---|---|
Principal Product | Fats&Oils,Edible |
NAICS | 311225: Fats and Oils Refining and Blending |
SIC | 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
95,000
ft2
|
Annual Production | 100,000
lb
|
Production Hrs. Annual | 5,296
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $338,675 | 7,252,085 |
kWh
|
$0.047 |
Electricity Demand | $76,837 | 18,030 |
kW-mo/yr
|
$4.26 |
Electricity Fees | $2,123 | - |
|
- |
Natural Gas | $144,705 | 24,696 |
MMBtu
|
$5.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,068 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,188 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $25,212 | $8,570 | - | - |
$25,212
-
MMBtu
|
|
02 | 2.2163: Use minimum steam operating pressure | $6,220 | - | - | - |
$6,220
-
MMBtu
|
|
03 | 2.2135: Repair and eliminate steam leaks | $4,750 | $1,125 | - | - |
$4,750
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,391 | $375 |
$3,621
62,023
kWh
|
$770
-
kW-mo/yr
|
- | |
05 | 2.2163: Use minimum steam operating pressure | $3,275 | - | - | - |
$3,275
-
MMBtu
|
|
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,900 | - | - |
$1,900
-
kW-mo/yr
|
- | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,340 | - |
$1,340
22,915
kWh
|
- | - | |
08 | 2.2511: Insulate bare equipment | $980 | $200 |
$980
16,852
kWh
|
- | - | |
TOTAL RECOMMENDED | $48,068 | $10,270 |
$5,941
101,790
kWh
|
$2,670
-
kW-mo/yr
|
$39,457
-
MMBtu
|
||
TOTAL IMPLEMENTED | $45,188 | $10,070 |
$4,961
84,938
kWh
|
$770
-
kW-mo/yr
|
$39,457
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs