Assessment Year | 2001 |
---|---|
Principal Product | Pre-Stressed/Precast Concrete |
NAICS |
n/a
|
SIC | 3279: |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
71,830
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,179 | 1,562,867 |
kWh
|
$0.052 |
Electricity Demand | $23,911 | 4,103 |
kW-mo/yr
|
$5.83 |
LPG | $33,728 | 1,654 |
MMBtu
|
$20.39 |
Fuel Oil #2 | $1,292 | 161 |
MMBtu
|
$8.02 |
Coal | $84,098 | 27,546 |
MMBtu
|
$3.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,894 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,073 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Coal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $1,868 | $200 |
$1,628
19,578
kWh
|
$240
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,400 | - |
$3,835
46,099
kWh
|
$565
-
kW-mo/yr
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,978 | $2,500 | - |
$3,978
-
kW-mo/yr
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,570 | $500 | - | - | - |
$7,570
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $3,090 | $1,000 |
$2,583
31,045
kWh
|
$507
-
kW-mo/yr
|
- | - | |
06 | 2.2111: Install steam trap | $1,932 | $1,000 | - | - | - |
$1,932
-
MMBtu
|
|
07 | 2.2136: Install / repair insulation on steam lines | $303 | $610 | - | - | - |
$303
-
MMBtu
|
|
08 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $753 | $2,700 | - | - |
$753
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $23,894 | $8,510 |
$8,046
96,722
kWh
|
$5,290
-
kW-mo/yr
|
$753
-
MMBtu
|
$9,805
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,073 | $2,310 |
$5,463
65,677
kWh
|
$805
-
kW-mo/yr
|
- |
$9,805
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Coal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs