ITAC Assessment: LE0109
ITAC logo
ITAC Assessment: LE0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Pre-Stressed/Precast Concrete
NAICS
n/a
SIC 3279:
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 71,830
ft2
Annual Production 0
units
Production Hrs. Annual 8,568
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,179 1,562,867
kWh
Electricity Demand $23,911 4,103
kW-mo/yr
LPG $33,728 1,654
MMBtu
Fuel Oil #2 $1,292 161
MMBtu
Coal $84,098 27,546
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Coal Savings
01 2.4314: Use synthetic lubricant $1,868 $200 $1,628
19,578
kWh
$240
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,400 - $3,835
46,099
kWh
$565
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,978 $2,500 - $3,978
-
kW-mo/yr
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $7,570 $500 - - - $7,570
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $3,090 $1,000 $2,583
31,045
kWh
$507
-
kW-mo/yr
- -
06 2.2111: Install steam trap $1,932 $1,000 - - - $1,932
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $303 $610 - - - $303
-
MMBtu
08 2.7491: Insulate glazing, walls, ceilings, and roofs $753 $2,700 - - $753
-
MMBtu
-
TOTAL RECOMMENDED $23,894 $8,510 $8,046
96,722
kWh
$5,290
-
kW-mo/yr
$753
-
MMBtu
$9,805
-
MMBtu
TOTAL IMPLEMENTED $16,073 $2,310 $5,463
65,677
kWh
$805
-
kW-mo/yr
- $9,805
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs