Assessment Year | 2003 |
---|---|
Principal Product | Boilers |
NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 4334: |
Sales Range | $10 M to 50M |
# of Employees | 202 |
Plant Area |
140,000
ft2
|
Annual Production | 2,500
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $195,170 | 1,925,933 |
kWh
|
$0.10 |
Natural Gas | $73,846 | 10,419 |
MMBtu
|
$7.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,038 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $12,003 | $16,100 | - | - |
$12,003
-
MMBtu
|
|
02 | 2.1133: Adjust burners for efficient operation | $1,035 | $540 | - | - |
$1,035
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $580 | $2,033 | - | - |
$580
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $531 | $1,608 |
$165
5,501
kWh
|
$366
-
kW-mo/yr
|
- | |
05 | 2.2437: Recover waste heat from equipment | $468 | $748 | - | - |
$468
-
MMBtu
|
|
06 | 2.4314: Use synthetic lubricant | $272 | $800 |
$121
4,036
kWh
|
$151
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $218 | - |
$101
3,359
kWh
|
$117
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $95 | $70 |
$95
3,182
kWh
|
- | - | |
TOTAL RECOMMENDED | $15,202 | $21,899 |
$482
16,078
kWh
|
$634
-
kW-mo/yr
|
$14,086
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,038 | $16,640 | - | - |
$13,038
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs