ITAC Assessment: SU0159
ITAC logo
ITAC Assessment: SU0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Electrical Insulating Sleeves
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 140,000
ft2
Annual Production 1,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,674 1,758,883
kWh
Electricity Demand $68,979 5,580
kW-mo/yr
Electricity Fees $13,648 -
Natural Gas $17,067 5,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $5,869 $18,122 - - $5,869
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,575 $15,750 $4,120
58,860
kWh
$1,455
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $1,187 $800 $877
12,527
kWh
$310
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,171 - $865
12,360
kWh
$306
-
kW-mo/yr
-
05 2.1224: Replace boiler $1,148 $13,507 - - $1,148
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,028 - $760
10,859
kWh
$268
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $276 $523 $202
2,891
kWh
$74
-
kW-mo/yr
-
TOTAL RECOMMENDED $16,254 $48,702 $6,824
97,497
kWh
$2,413
-
kW-mo/yr
$7,017
-
MMBtu
TOTAL IMPLEMENTED $4,810 $14,830 $2,704
38,637
kWh
$958
-
kW-mo/yr
$1,148
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs