Assessment Year 2003
Principal Product Contract Packaging, Warehousing
NAICS 488991: Packing and Crating
SIC 4783: Packing and Crating
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 152,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,375
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,515 1,533,022
kWh
Electricity Demand $23,177 4,508
kW-mo/yr
Electricity Fees $8,799 -
Natural Gas $58,667 10,006
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,358

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $45,993 - $39,475
664,518
kWh
$6,518
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $2,969 $11,310 - - $2,969
-
MMBtu
03 2.2437: Recover waste heat from equipment $7,728 $2,468 - - $7,728
-
MMBtu
04 2.6218: Turn off equipment when not in use $1,835 - $1,495
23,100
kWh
$340
-
kW-mo/yr
-
05 2.2531: Re-size charging openings or add movable cover or door $1,647 $8,000 - - $1,647
-
MMBtu
06 2.7243: Improve air circulation with destratification fans / other methods $2,020 $7,486 - - $2,020
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,147 - $1,147
22,940
kWh
- -
08 2.6212: Turn off equipment during breaks, reduce operating time $858 - $858
17,160
kWh
- -
09 2.7135: Install occupancy sensors $849 $640 $849
12,128
kWh
- -
10 2.1233: Analyze flue gas for proper air/fuel ratio $803 $406 - - $803
-
MMBtu
11 2.4221: Install compressor air intakes in coolest locations $376 $558 $376
7,517
kWh
- -
TOTAL RECOMMENDED $66,225 $30,868 $44,200
747,363
kWh
$6,858
-
kW-mo/yr
$15,167
-
MMBtu
TOTAL IMPLEMENTED $3,358 $558 $3,018
53,557
kWh
$340
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs