Assessment Year | 2020 |
---|---|
Principal Product | Plastic Molding |
NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
49,000
ft2
|
Annual Production | 17,000,000
ton
|
Production Hrs. Annual | 7,956
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $283,875 | 5,575,220 |
kWh
|
$0.051 |
Electricity Demand | $188,927 | 11,808 |
kW-mo/yr
|
$16.00 |
Electricity Fees | $6,087 | - |
|
- |
Natural Gas | $17,893 | 2,672 |
MMBtu
|
$6.70 |
TOTAL YEARLY COSTS | $496,782 | |||
RECOMMENDED SAVINGS* | $25,728 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $1,642 | - | - | - |
$1,642
-
MMBtu
|
|
02 | 2.4322: Use or replace with energy efficient substitutes | $296 | - |
$207
4,078
kWh
|
$89
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,178 | $425 |
$4,874
95,719
kWh
|
$2,304
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $6,110 | $4,000 | - | - |
$6,110
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,920 | $3,260 |
$3,920
76,984
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,582 | $32,713 |
$3,830
75,220
kWh
|
$2,752
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $25,728 | $40,398 |
$12,831
252,001
kWh
|
$5,145
-
kW-mo/yr
|
$7,752
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs