ITAC Assessment: SU0154
ITAC logo
ITAC Assessment: SU0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Electric Motor Components
NAICS 335312: Motor and Generator Manufacturing
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 61,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,816 1,199,360
kWh
Electricity Demand $53,868 3,598
kW-mo/yr
Electricity Fees $922 -
Natural Gas $20,484 3,030
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,227 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4224: Upgrade controls on compressors $11,147 $820 $4,111
58,741
kWh
$7,036
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $692 $133 $692
9,886
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $653 - $653
9,324
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $601 $264 $601
8,591
kWh
-
05 2.7135: Install occupancy sensors $134 $120 $134
1,920
kWh
-
TOTAL RECOMMENDED $13,227 $1,337 $6,191
88,462
kWh
$7,036
-
kW-mo/yr
TOTAL IMPLEMENTED $826 $253 $826
11,806
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs