ITAC Assessment: NV0013
ITAC logo
ITAC Assessment: NV0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Bleach
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 3,650,000
Tgal
Production Hrs. Annual 3,744
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,187 285,463
kWh
Natural Gas $28,906 10,580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $408 $57 $408
4,982
kWh
-
02 2.4133: Use most efficient type of electric motors $304 $149 $304
3,517
kWh
-
03 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $714 $1,100 - $714
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $286 $100 $286
3,517
kWh
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $349 $300 $349
4,103
kWh
-
06 2.7261: Install timers and/or thermostats $730 $790 - $730
-
MMBtu
07 2.7243: Improve air circulation with destratification fans / other methods $1,163 $1,350 - $1,163
-
MMBtu
TOTAL RECOMMENDED $3,954 $3,846 $1,347
16,119
kWh
$2,607
-
MMBtu
TOTAL IMPLEMENTED $1,320 $1,039 $590
7,034
kWh
$730
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs