ITAC Assessment: SU0153
ITAC logo
ITAC Assessment: SU0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Heat Transfer Equipment
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3440:
Sales Range $10
M
to 50
M
# of Employees 295
Plant Area 250,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $353,731 5,035,200
kWh
Electricity Demand $189,813 14,395
kW-mo/yr
Electricity Fees $11,337 -
Natural Gas $250,256 35,253
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $165,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,157

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $57,642 $93,355 $41,266
589,513
kWh
$16,376
-
kW-mo/yr
- -
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $42,094 $93,819 - - $42,094
-
MMBtu
-
03 2.2121: Increase amount of condensate returned $30,876 $11,602 - - $25,071
-
MMBtu
$5,805
-
Tgal
04 2.7491: Insulate glazing, walls, ceilings, and roofs $12,993 $7,176 - - $12,993
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,229 $438 $5,229
74,706
kWh
- - -
06 2.3212: Optimize plant power factor $5,043 $16,501 - $5,043
-
kW-mo/yr
- -
07 3.4111: Use closed cycle process to minimize waste water production $4,900 $16,700 - - - $4,900
-
Tgal
08 2.2414: Use waste heat from hot flue gases to preheat $3,098 $12,105 - - $3,098
-
MMBtu
-
09 2.4239: Eliminate or reduce compressed air usage $2,467 $163 $2,467
35,247
kWh
- - -
10 2.4221: Install compressor air intakes in coolest locations $882 $249 - - $882
-
MMBtu
-
TOTAL RECOMMENDED $165,224 $252,108 $48,962
699,466
kWh
$21,419
-
kW-mo/yr
$84,138
-
MMBtu
$10,705
-
Tgal
TOTAL IMPLEMENTED $106,157 $138,759 $48,962
699,466
kWh
$21,419
-
kW-mo/yr
$25,071
-
MMBtu
$10,705
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs