| Assessment Year | 2002 |
|---|---|
| Principal Product | Corrugated Boxes |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 128 |
| Plant Area |
200,000
ft2
|
| Annual Production | 430,000
thousand feet
|
| Production Hrs. Annual | 6,006
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $227,395 | 3,273,000 |
kWh
|
$0.069 |
| Electricity Demand | $139,490 | 9,318 |
kW-mo/yr
|
$14.97 |
| Electricity Fees | $8,164 | - |
|
- |
| Natural Gas | $193,637 | 44,753 |
MMBtu
|
$4.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,526 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $10,627 | $14,850 | n/a | - | - |
$10,627
-
MMBtu
|
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $6,105 | $110 | n/a |
$6,105
63,601
kWh
|
- | - |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,683 | $10,300 | n/a |
$5,683
82,362
kWh
|
- | - |
| 04 | 2.3212: Optimize plant power factor | $5,043 | $16,500 | n/a | - |
$5,043
-
kW-mo/yr
|
- |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,217 | $160 | n/a |
$4,217
60,250
kWh
|
- | - |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,659 | $270 | n/a |
$2,659
38,540
kWh
|
- | - |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $2,192 | $103 | n/a |
$2,192
31,781
kWh
|
- | - |
| TOTAL RECOMMENDED | $36,526 | $42,293 |
$20,856
276,534
kWh
|
$5,043
-
kW-mo/yr
|
$10,627
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs