ITAC Assessment: SU0148
ITAC logo
ITAC Assessment: SU0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Dried Fruits
NAICS
n/a
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 50,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,945 968,160
kWh
LPG $257,020 41,144
MMBtu
Other Gas $351 36
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $247,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Other Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $163,907 $767,895 $99,945
968,160
kWh
$77,162
-
MMBtu
- - $(-13,200.0) -
02 2.1133: Adjust burners for efficient operation $25,533 - - $25,533
-
MMBtu
- - - -
03 4.426: Modify workload $14,400 $20,000 - - - - $14,400 -
04 3.6192: Use a less expensive method of waste removal $31,584 $17,490 - - $351
-
MMBtu
$18,000
-
gal
$9,389 $3,844
05 2.7233: Use properly designed and sized hvac equipment $9,006 $3,700 - $9,006
-
MMBtu
- - - -
06 2.7111: Reduce illumination to minimum necessary levels $2,438 $320 $2,438
48,876
kWh
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $105 - $105
2,105
kWh
- - - - -
08 2.4221: Install compressor air intakes in coolest locations $70 $60 $70
2,797
kWh
- - - - -
TOTAL RECOMMENDED $247,043 $809,465 $102,558
1,021,938
kWh
$111,701
-
MMBtu
$351
-
MMBtu
$18,000
-
gal
$10,589 $3,844
TOTAL IMPLEMENTED $80,698 $41,250 $175
4,902
kWh
$34,539
-
MMBtu
$351
-
MMBtu
$18,000
-
gal
$23,789 $3,844
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Other Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs