ITAC Assessment: UD0570
ITAC logo
ITAC Assessment: UD0570
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product machined automotive components and assemblies
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 160,000
ft2
Annual Production 952,000
pieces
Production Hrs. Annual 4,131
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,545 913,834
kWh
Electricity Demand $34,106 2,424
kW-mo/yr
Natural Gas $12,159 2,514
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,111

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.611: Begin a practice of predictive / preventative maintenance $27,963 - - - - $20,493 - $6,000 $1,470
02 3.5217: Reuse / recycle/ sell paper products $5,639 $8,900 - - $2,763
-
lb
$(-600.0) $3,476 - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,148 $200 $2,021
74,736
kWh
$2,127
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $37,750 $9,100 $2,021
74,736
kWh
$2,127
-
kW-mo/yr
$2,763
-
lb
$19,893 $3,476 $6,000 $1,470
TOTAL IMPLEMENTED $32,111 $200 $2,021
74,736
kWh
$2,127
-
kW-mo/yr
- $20,493 - $6,000 $1,470
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs