Assessment Year | 2002 |
---|---|
Principal Product | Blow Molded Parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
91,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,954 | 2,790,240 |
kWh
|
$0.067 |
Electricity Demand | $95,554 | 7,117 |
kW-mo/yr
|
$13.43 |
Electricity Fees | $5,437 | - |
|
- |
Natural Gas | $15,694 | 1,810 |
MMBtu
|
$8.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,771 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $6,867 | $39,847 |
$4,933
73,630
kWh
|
$1,934
-
kW-mo/yr
|
- | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $4,126 | $7,590 |
$(-965.0)
(-14,400)
kWh
|
$258
-
kW-mo/yr
|
- |
$4,833
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $3,432 | $2,288 | - | - | - |
$3,432
-
MMBtu
|
|
04 | 2.3212: Optimize plant power factor | $2,974 | $8,850 | - | - | $2,974 | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $2,193 | $1,528 |
$2,193
32,731
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,104 | $5,675 |
$2,104
31,409
kWh
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,381 | $437 |
$1,381
20,613
kWh
|
- | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $694 | $196 |
$315
4,704
kWh
|
$379
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $23,771 | $66,411 |
$9,961
148,687
kWh
|
$2,571
-
kW-mo/yr
|
$2,974 |
$8,265
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs