ITAC Assessment: SU0146
ITAC logo
ITAC Assessment: SU0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product paper products
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 170,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,136 806,400
kWh
Electricity Demand $62,730 4,190
kW-mo/yr
Electricity Fees $7,451 -
Natural Gas $49,424 7,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 4.811: Demolish old building to reduce tax and insurance bills $18,266 $35,000 $55
832
kWh
$72
-
kW-mo/yr
- $18,139
-
MMBtu
- -
02 3.5217: Reuse / recycle/ sell paper products $16,051 $38,750 - - - $16,051
-
MMBtu
- -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $6,273 $61,828 - - - $6,273
-
MMBtu
- -
04 4.114: Add/modify equipment to improve drying process $4,723 $420 $(-685.0)
(-10,400)
kWh
- - - - $5,408
05 2.4239: Eliminate or reduce compressed air usage $4,500 $852 $4,500
68,289
kWh
- - - - -
06 3.4114: Replace city water with recycled water via cooling tower $799 $1,690 $(-39.0)
(-597)
kWh
- - - $838
-
Tgal
-
07 2.8123: Pay utility bills on time $791 - - - $791 - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $494 - $494
7,500
kWh
- - - - -
09 2.7135: Install occupancy sensors $383 $288 $383
5,816
kWh
- - - - -
10 2.4221: Install compressor air intakes in coolest locations $255 $11 $255
3,867
kWh
- - - - -
TOTAL RECOMMENDED $52,535 $138,839 $4,963
75,307
kWh
$72
-
kW-mo/yr
$791 $40,463
-
MMBtu
$838
-
Tgal
$5,408
TOTAL IMPLEMENTED $11,562 $2,973 $4,525
68,659
kWh
- $791 - $838
-
Tgal
$5,408
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs