ITAC Assessment: SU0145
ITAC logo
ITAC Assessment: SU0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product frozen foods
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 266,000
ft2
Annual Production 93,000,000
lb
Production Hrs. Annual 5,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $847,694 12,621,912
kWh
Electricity Demand $151,200 29,731
kW-mo/yr
Natural Gas $174,069 31,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Water Disposal Savings Personnel Changes Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $50,000 $250,000 - - - - $50,000
02 3.4115: Recover and reuse cooling water $10,576 $10,750 - - - $10,576
-
Tgal
-
03 2.3212: Optimize plant power factor $7,242 $23,410 - - $7,242
-
MMBtu
- -
04 2.7135: Install occupancy sensors $1,309 $1,925 $1,309
27,267
kWh
- - - -
05 2.7124: Make a practice of turning off lights when not needed $280 $25 $280
5,480
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $193 $545 $193
4,015
kWh
- - - -
07 2.2511: Insulate bare equipment $50 $129 - $50
-
MMBtu
- - -
TOTAL RECOMMENDED $69,650 $286,784 $1,782
36,762
kWh
$50
-
MMBtu
$7,242
-
MMBtu
$10,576
-
Tgal
$50,000
TOTAL IMPLEMENTED $280 $25 $280
5,480
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs